2024
Name of Project or Yard Number | Customer | Year | Type of work |
---|---|---|---|
FB291 – MY 80m | Benetti | 2024 | Outfitting drawings and detail structural design |
C.6371 | Fincantieri | 2024 | Main scantling plan, calcs and NAPA Steel model of the biggest ship ever built by the client |
PSI Indian Navy FSS Program | Fincantieri | 2024 | Support as Propulsion System Integrator, review of machiney and P&IDs, FE structural analyses |
C.6333 towing tank tests | Fincantieri | 2024 | Development of NAPA Steel model |
Newbuilding consultancy | Crystal Cruises | 2024 | Consultancy services from Owner side during pre-contractual design phase |
C.6368 | Fincantieri | 2024 | Development of NAPA Steel model and Classification drawings for superstructures |
Enchanted Princess conversion to MeOH | Fincantieri | 2024 | Consultancy for the conversion of the ship Enchanted Princess to dual fuel with methanol |