2019
Name of Project or Yard Number | Customer | Year | Type of work |
---|---|---|---|
C.6274 Cunard – NAPA model update | Fincantieri | 2019 | NAPA model update and weight extraction |
Carnival Sunshine – Sprinkler As Built | Fincantieri Services USA | 2019 | Consulting – As Built Sprinkler System drawings development |
C.6319 – MSC Luxury Ventilation | Fincantieri | 2019 | Basic Design of Engine Room and Technical areas ventilation |
C.6274 – Cunard | Fincantieri | 2019 | Detailed/production structural engineering |
RSY 45m EXP | Rosetti SuperYachts | 2019 | Development of architectural concept design |
C.6319 – MSC Luxury | Fincantieri | 2019 | Development of Main Scantling Plan and associeted documentation |
M/Y 65 m EXP | Confidential | 2019 | Multidisciplinary Feasibility Study and Exterior Design |
S/Y 90 m | Perini Navi | 2019 | Multidisciplinary Feasibility Study |
Subsea Retrieval Frame | RANA Diving | 2019 | Feasibility and Detail design of a TBM lifting frame |
M/Y Odyssey | Felham Enterprises | 2019 | Structural and Fuctional consultancy for refitting |
SLS 18062 | San Lorenzo | 2019 | Basic and Detail Structural Design documents update |
C.6278 | Fincantieri | 2019 | Structural Detail Design |
SY 111m C.2411 | Confidential | 2019 | Multidisciplinary Feasibility Study |
Explorer Cruise Vessel 23000 GT | Mariotti | 2019 | Detail and Production Enineering of Hull Structures |
MY 70m | CRN | 2019 | Multidisciplinary Basic and Detail Design |
SY 42m C.2399 | Perini Navi | 2019 | Multidisciplinary Basic and Detail Design |