2017
| Name of Project or Yard Number | Customer | Delivery | Type of work |
|---|---|---|---|
| M/Y The Wellesley | Chief officer Daniel King | 2017 | Owner Consultancy |
| GEOG_Block | Baker Hughes | 2017 | Consultancy – Sea Transportation Fatigue Calculation |
| MY 62 metri – San Lorenzo (ripetuta) | San Lorenzo | 2017 | Basic Design and Detailed Engineering |
| Falcon Taxi 40 | SAFWA Marine | 2017 | Basic design for Dubai presentation |
| Falcon Taxi 18 | SAFWA Marine | 2017 | Basic design for Dubai presentation |
| Zuiderdam cracks repair | Fincantieri | 2017 | Structural Consultancy |
| 0500405 Kashagan – TUCO building | BHGE | 2017 | Structural Calculation |
| C.2239 Refitting Sailing Yacht – Saling Plan Modification | Perini Navi | 2017 | Refitting – Basic Design |
| SY 47 m – Perini Navi | Perini Navi | 2017 | Basic Design |
| G-Adventure explorer | Confidential | 2017 | Ship Owner Consultancy |
| REV | VARD | 2017 | Giga Yacht – Consultancy |
| Offshore Patrol Vessel | Confidential | 2017 | Concept Design |
| Drilling barge HP1500 | Fincantieri Oil & Gas | 2017 | Concept Design |
| MSC Splendida | Fincantieri | 2017 | Cruise Ship Refitting – Basic Design |
| Cruise Roma | Fincantieri | 2017 | RORO PAX Lenghtening – Feasibility Study |
| Polar Explorer Yard Support | VARD | 2017 | On site Electrical Consultancy |
| Silver Spirit – Ship Lenghtening | Fincantieri | 2017 | Basic Design |
| Hapag Lloyd – HVAC consulenza | VARD | 2017 | Cruise Ship – HVAC Consultancy |
| Carnival Victory | Fincantieri | 2017 | Cruise Ship Refitting Basic Design |
| HAL Westerdam | Fincantieri | 2017 | Cruise Ship Refitting Basic Design |
| C.6287 – Virgin Ex Funzionali | Fincantieri | 2017 | Oufitting Design |
| Explorer Cruise Vessel | Confidential | 2017 | Feasibility Study |
| Ocean Victory | Fincantieri | 2017 | Feasibility Study |
| Seadream Cruise Luxury Vessel | VARD | 2017 | Concept Design |
| Allungamento navi Finlines | Fincantieri | 2017 | Basic Design |
| Anti Submarine Warfare (ASW) 25 meters | Confidential | 2017 | Feasibility Study |