2013
Name of Project or Yard Number | Customer | Department | Type of work | Delivery |
---|---|---|---|---|
MSC Armonia | Fincantieri | Marine | Refitting Basic Design – Ship Lengthening | 2013 |
MSC Lirica | Fincantieri | Marine | Refitting Basic Design – Ship Lengthening | 2013 |
Flute System for JLT SAIPEM 7000 | Goriziane | Oil&Gas | Structural Design | 2013 |
AHT Braveheart | Barry Towage | Oil&Gas | Stability Calculation & Instruction for the Master | 2013 |
Drilling Ship Castor | Fincantieri | Oil&Gas | Feasibility Study | 2013 |
MSC Reinasance Program | Fincantieri | Marine | Refitting Feasibility Study | 2013 |
Cruise Vessel Carnival Freedom | Fincantieri | Marine | Refitting Feasibility Study | 2013 |
LNG Turbocompressor Train Module | Nuovo Pignone – GE | Oil&Gas | Structural Feasibility Study | 2013 |
Fauza Elettra Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report | 2013 |
Marlin Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report | 2013 |
C. 6239 – RO/RO PAX | Fincantieri | Marine | FEM analysis | 2013 |
Air Compressor Skid Module | Ingersoll Rand | Oil&Gas | Structural Design | 2013 |
Browse LNG MR Module | Nuovo Pignone – GE | Oil&Gas | Feasibility Study | 2013 |
IKA JZ Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report | 2012 |
MY 100 meters | Confidential | Yacht | Refitting – Concept design | 2013 |