2012
| Name of Project or Yard Number | Customer | Department | Type of work | Delivery |
|---|---|---|---|---|
| IKA JZ Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report | 2012 |
| Smart Drill Ship | Fincantieri | Oil&Gas | Feasibility Study | 2012 |
| C. 6223 – Carnival 140.000 GT Cruise Vessel | Fincantieri | Marine | Construction Monitoring | 2012 |
| Clipper Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report | 2012 |
| HAL – Nordaam Refitting | Fincantieri | Oil&Gas | Refitting Basic Design | 2012 |
| C.108 | Rosetti Marino | Oil&Gas | Launching Calculation | 2012 |
| X-Drilling Ship | Fincantieri | Oil&Gas | Technical Specification Analysis; Weight Estimation | 2012 |
| Heavy lift semi-submersible non propelled unit | Fincantieri | Oil&Gas | Functional Design | 2012 |
| Cruise vessel Carnival Glory | Fincantieri | Marine | Refitting Basic Design | 2012 |
| Cruise vessel Carnival Conquest | Fincantieri | Marine | Refitting Basic Design | 2012 |
| ARROW PG Module | Nuovo Pignone – GE | Oil&Gas | Feasibility Study | 2012 |
| SY 69 meters | Perini Navi / Viareggio Italy | Yacht | Structural Scantling Plans, FEM Analysis, Outfitting, Workshop Drawings | 2012 |
| MY 172,5 meters | Fincantieri Yachts | Yacht | Structural Scantling Plans, FEM Analysis, Outfitting | 2012 |
| ZADCO GTG Module | Nuovo Pignone – GE | Oil&Gas | Feasibility Study | 2012-2014 |
| Mine Hunter | CSBC | Defence | Concept Design | 2012 |
| Shell Platform | Basis Engineering/Rosetti Group | Oil&Gas | Weight Control Report |